HybridPPM.com
Hybrid project management

Hybrid project management software for plan-based and Agile work together

HybridPPM is hybrid project management software: one platform where each project, or each part of a project, runs the way it should. Plan phases, milestones and the budget on a Gantt schedule, deliver the work in sprints or on a Kanban board, and report it all as one project.

One project, two rhythms

A predictive plan and Agile delivery side by side, joined by shared milestones.

One status picture

Schedule progress, earned value and sprint results feed the same reports.

Rolls up live

Every project, whatever its method, rolls up to programs and portfolios.

Reviewed by Mike Berry

Why one method rarely fits a whole project

Most real projects have parts that are fixed and parts that are still being discovered. A new office has a lease date, building works and contracts, but the staff app that goes with it improves with every round of feedback. Forcing one method on both means either a plan that keeps breaking or a backlog nobody can commit to.

A predictive project in HybridPPM: phases, schedule and earned value.
A predictive project in HybridPPM: phases, schedule and earned value.

What a hybrid approach gives you

  • Up-front planning where change is costly: contracts, regulated work, fixed dates.
  • Iterative delivery where requirements are still unclear and early feedback is valuable.
  • One set of milestones and governance across both, so sponsors see one project.

Choosing the approach for each part

  • Clear, stable requirements point to a predictive plan; unclear or changing ones point to sprints or a board.
  • Work that can be used in pieces benefits from incremental delivery.
  • Contracts, regulation and safety often need formal approvals at gates.

A Gantt schedule and sprints in the same project

In HybridPPM you don’t pick between a scheduling tool and an Agile tool. A hybrid project has a WBS and Gantt chart for its phases and milestones, and a backlog and sprint board for the work delivered iteratively, in the same place.

An Agile sprint board in HybridPPM.
An Agile sprint board in HybridPPM.

Plan-based side

  • The WBS, Gantt chart, dependencies with lag, and the critical path with total float.
  • Saved baselines, with variance shown on the Gantt and in reports.
  • Phases and stage gates with criteria, approvers and Go / Hold / Stop decisions.

Agile side

  • Product backlog, story points, sprint planning and the sprint board.
  • Velocity, throughput, cycle time and lead time from the work the team actually finished.
  • Kanban and Scrumban boards for teams that work in a continuous flow.

Hybrid in HybridPPM

  • Each project chooses plan-based, Agile, Kanban, Scrumban or hybrid, and can change views without changing tools.
  • Monte Carlo forecasting gives 50 / 85 / 95% likely finish dates from team throughput or schedule risk.
  • Import an existing plan from Microsoft Project (.mpp or XML), Excel or CSV, Jira, Asana, Trello or monday.com.
  • An AI agent that knows the project can draft the charter and the first plan for you to review.

How hybrid work rolls up to programs and portfolios

Projects that run differently still belong to the same programs and portfolios. HybridPPM rolls them up live, so the big picture doesn’t have to be rebuilt in spreadsheets every week.

A program in HybridPPM rolling up its projects.
A program in HybridPPM rolling up its projects.

What rolls up

  • Progress, budget, earned value and risk from every project, whatever its method.
  • Milestones that link sprint results to the schedule, so a sponsor sees one picture.
  • Risk, issue and stakeholder registers, and change control with reference numbers.

Reporting that stays consistent

Story-point progress and earned value can feed the same status report. Reports build and send themselves, and live portals let customers and sponsors see progress without signing in.

Who it’s for

Hybrid delivery touches everyone from the PMO to the delivery team. Each of them gets the view they need from the same data.

A customer report in HybridPPM.
A customer report in HybridPPM.

PMO and portfolio leaders

See every project, program and portfolio in one place, and decide where to invest, without asking teams to change how they work.

Project managers

Run the plan, the gates and the registers by the book, while the team delivers in sprints or on a board.

Delivery teams

One list of their own work, wherever it lives, on the board or schedule that suits them.

Sponsors and customers

Live reports and portals they can open without an account or anything to install.

Questions

Questions, answered

What is hybrid project management?

Hybrid project management combines a predictive, plan-based approach with Agile delivery in the same project. Typically the phases, milestones and budget are planned up front, and the deliverables inside each phase are built in sprints or on a Kanban board, with one set of governance and reporting over both.

Can one project have both a Gantt schedule and sprints?

Yes. A hybrid project in HybridPPM has a WBS and Gantt chart for its phases and milestones, and a backlog and sprint board for the work delivered iteratively. Both feed the same project dashboard and reports.

Can we import plans from Microsoft Project or Excel?

Yes. You can import a Microsoft Project plan (.mpp or Project XML), an Excel or CSV file, or an export from Jira, Asana, Trello or monday.com. You review what was found before anything is added.

Is HybridPPM aligned with PMI standards?

Yes. Process groups, registers, earned value and project documents follow the PMI standards behind the PMP, PgMP, PfMP, PMI-PBA and PMI-ACP certifications.

Do we have to choose one method for the whole organization?

No. Each project chooses plan-based, Agile, Kanban, Scrumban or hybrid, and everything still rolls up to the same programs and portfolios.

Reviewed by Mike Berry. HybridPPM follows the PMI standards behind the PMP, PgMP, PfMP, PMI-PBA and PMI-ACP certifications. PMI, PMP, PgMP, PfMP, PMI-PBA and PMI-ACP are registered marks of the Project Management Institute, Inc. Screenshots show a fictional demo organization.

Bring plan-based and Agile work into one plan

Start free with your whole team, run each project the way it should run, and see it all roll up.